UBC KLINK Data/Generator

We installed a new Diesel Generator electronic transfer switch and distribution. We installed the entire conduit underground between the distribution switchgear and transformers for a really clean installation. A challenging project, that involved the switchgear being lowered through and accessed in the floor above. At the same time the transfer switch had to be divided to fit through the main doors.